(06/11/08)
- Pavers will soon be installed on the pool deck
- In the next few weeks expect to see a large crane enter the site to place the slide tower at the rear of the Fun Pool and the cupola on the top of the Plantation Clubhouse
- After the crane work is finished then the parking lot paving can begin
(05/13/08)
- The Plantation Clubhouse has all the drywall in place
- The exterior paint is finished
- Light poles are up in the parking lot and on the tennis courts
- A walking/jogging path is planned for the banks of the large pond to the right of the clubhouse
- The roof of the Clubhouse has all its shingles
(02/28/08)
(12/19/07)
- The second floor is framed
- The second floor slab is poured
- The roof trusses are due to be erected soon
- Concrete block is complete on the exterior Aquatic Building
- The concrete on both large pools is complete
(11/15/07)
- The latest reports tell us that there is continued progress at the skate park
- Both pools are dug and work is progressing on them
- The tennis courts are staked out and the ground is being prepared
- Concrete block portion of The Plantation Club is complete
(10/10/07)
- The abundance of rain last week was certainly felt at the construction site. However, when the contractor estimates the time it will take to complete a project they plan in certain weather related delays. As things dry out we should be right back on schedule.
- It was decided last night at the monthly CDD meeting to have pavers installed for the pool deck. Pavers are comparable in cost to concrete decking and more attractive both from a practicallity standpoint and an aesthetic one.
(9/26/07)
-
As of this posting the land has been cleared all the way back to the site of the main club house area.
-
On September 25th the last of the three necessary building permits were granted and now the contractors and architects are looking forward to "going vertical" with the building.
-
Because the main club house building is set far back on the property, it is very unlikely that progress will be visible from Durbin Creek Blvd. The building that may be partially visible as you drive by the construction site would be the building at the skate park and basketball courts.
-
The estimates from the contractor indicate that the building process should take eleven months.
-
Please keep checking this webpage for updates.
- To get a better idea of what is being built scroll down this page!
Now Hiring!
Group Exercise Instructors, Personal Trainers, Fitness Floor Staff
for our new recreation center
email: kharless@jcpcdd.org
or call the number below 287-2633
New Photos Coming Soon...
5/21/08
Front View of Club House

Side View of Club House

Back View of Club House

Back View and Family Pool

Front Entrance of Club House

Family Pool and Pool House

Skate Park and Skate House

Front of Club House and Parking Lot

Walkway in Club House

Pool House Rear

Pool House with Baby pool

Aerial View of Club House

Floor Plans of New Facility
|
Overall First Floor Plan
(The first floor of the
main club house will
have a cafe', mult-
purpose rooms, rest rooms / locker rooms,
a teen retreat, and an area for small children to be watched while parents workout.)
For a PDF version that you can scale larger, click here |
 |
Overall Second Floor Plan
(The second floor will
be the fitness floor.
It will be outfitted with
exercise equipment as
well as free weights
and an areobics studio.)
For a PDF version that you can scale larger, click here |
 |
Club House Site Plan
(Tennis courts will have
a clay surface, the competition pool will
be heated and open
year round.)
For a PDF version that you can scale larger, click here |
 |
Pool House Floor Plan
(This building will be located behind the
main club house near
the swimming pools.
It will house a lifeguard office, member rest-rooms, pool storage and pool filter rooms.)
For a PDF version that you can scale larger, click here |
 |
Open Air Gym Site Plan
(Skate park &
Basketball courts)
For a PDF version that you can scale larger, click here |
 |
Overal Site Plan
For a PDF version that you can scale larger, click here |
 |
|